Palm Islands,Dubai, United Arab Emirates:


Palm Islands,Dubai, United Arab Emirates:


The Palm Islands are two artificial islands in Dubai, United Arab Emirates in the shape of palm trees. The Belgian and Dutch dredging and marine contractors Jan De Nul and Van Oord, were hired to complete construction. The islands are the Palm Jumeirah and the Palm Jebel Ali.
Each settlement will be in the shape of a palm tree, topped with a crescent. The settlements will have a large number of residential, leisure and entertainment centres and will add 520 kilometres of non-public beaches to the city of Dubai.
The two islands will comprise approximately 100,000 cubic metres (3,500,000 cu ft) of rock and sand. All materials will be quarried in The UAE. On the two islands, there will be over 100 luxury hotels, residential beach-side villas and apartments, marinas, water theme parks, restaurants, shopping malls, sports facilities and health spas.
The creation of the Palm Jumeirah began in June 2001. Shortly after, the Palm Jebel Ali was announced and reclamation work began. A third island was planned and construction started, but this project was later remodelled and renamed to Deira Island.

The Palm Islands are artificial islands constructed from sand dredged from the bottom of the Persian Gulf by the Belgian company, Jan De Nul and the Dutch company, Van Oord. The sand is sprayed from the dredging ships, which are guided by a Global Positioning System, on to the required area. The process is known as rainbowing because of the rainbow-like arcs produced in the air when the sand is sprayed. The outer edge of each palm's encircling crescent is a large rock breakwater. The breakwater of the Palm Jumeirah has over seven million tons of rock. Each rock was placed individually by a crane, signed off by a diver and given a Global Positioning System coordinate. The Jan De Nul Group started working on the Palm Jebel Ali in 2002 and had finished by the end of 2006. The reclamation project for the Palm Jebel Ali includes the creation of a four-kilometer-long peninsula, protected by a 200-meter-wide, seventeen-kilometer long circular breakwater. There are 210,000,000 cubic meters of rock, sand and limestone that were reclaimed (partly originating from the Jebel Ali entrance channel dredging work). There are approximately 10,000,000 cubic meters of rocks in the Slope Protection Works.